Permit to work · In pilot

Permits to work, signed and kept in one register.

SafeBook keeps a vessel's permits to work in one shared register on the ship's own network. Each permit is drafted, cleared, issued, accepted, handed back and closed by named people, and every step is signed and kept.

A welder at work with sparks flying

The workload

A permit passes through many hands.

Who signed what

On paper it can be hard to see who cleared the area, who issued the permit and who accepted it.

What is active now

Permits expire, are suspended or share an isolation. The board shows which are active and which are about to run out.

A history that holds

Each step is kept as a signed entry in the register, so a permit's history cannot be quietly rewritten.


How it works

From a draft to a closed permit.

01

Prepare

The permit is drafted from the template for the job: general work, hot work, enclosed-space entry, electrical isolation, or work at height and over the side.

02

Clear and issue

The area officer clears the area and the issuer issues the permit, each signing with a fresh password entry.

03

Accept and work

The person leading the work accepts the permit before work starts. A suspension stops the work until it is lifted.

04

Hand back and close

When the job is done the permit is handed back and closed. A permit holding a shared isolation cannot close while a linked permit is still open.


Checks

Checks that follow the type of work.

Sparks from an angle grinder in a workshop

01

Type-specific items

Hot work asks for a fire watch and fire-fighting equipment. Enclosed-space entry asks for gas test results, ventilation, an attendant and rescue arrangements. Electrical work asks for locked isolation points and a zero-energy check.

02

Limited validity

A permit runs for at most eight hours and ends with the shift. A change of scope, an extension or a shift handover goes back through clearance, issue and acceptance.

03

Three different people

The area officer, the issuer and the person leading the work must be three different users.

04

Printed for the worksite

Each permit prints on one A4 sheet, with its revision and the time of every named signature.


On board

One register on the ship's network.

01

Shared by the workstations

The ship's Windows computers share one dedicated folder on the vessel's server. No connection ashore is needed.

02

Named accounts

The ship's administrator issues each user's account. An idle session locks after 15 minutes.

03

Checked before every change

The register is verified before each step. If the folder is unavailable or a record is damaged, electronic changes stop and the paper procedure takes over.

04

Verified backups

A backup copies the register and its attachments to a new folder and checks the copy against the original.


Getting started

What comes before the first electronic permit.

Before any permit is issued electronically, a vessel goes through these steps.

01

Compare the templates

The vessel's technical owner compares each template with the ship's safety management system and records the differences.

02

Test on two workstations

Two separate computers on the vessel network exercise every template, simultaneous edits, a lost connection and a restore.

03

Pilot on one vessel

Thirty days with printed permits and the paper procedure alongside, with any defects logged and corrected.

04

Timetable

Fix the dates for the workstation test, the start of the 30-day pilot and its review.


Scope

What it does and doesn't do.

What it does

  • Keeps a vessel's permits to work in one shared register on the ship's own network, with no connection ashore needed.
  • Takes each permit through drafting, clearance, issue, acceptance, hand-back and closing by named people, with every step signed and kept.
  • Applies checks that follow the type of work, limits a permit to eight hours at most and requires three different users.
  • Prints each permit on one A4 sheet for the worksite.

What it doesn't do, or not yet

  • Before any permit is issued electronically, a vessel compares the templates with its safety management system, tests on two workstations and runs a 30-day pilot with the paper procedure alongside.
  • If the register's folder is unavailable or a record is damaged, electronic changes stop and the paper procedure takes over. Using SafeBook does not replace required official records or approvals.

Start with your permit forms.

Send us the permit forms you use now and tell us how many workstations and departments work with them. The next discussion covers whether SafeBook fits your procedure, what needs adapting and what a pilot would involve.

Send us your permit forms or write to info@vesselsuite.app